{"id":139956,"date":"2025-05-13T07:55:23","date_gmt":"2025-05-13T04:55:23","guid":{"rendered":"https:\/\/tietopankki.crnet.fi\/fi\/yleinen\/blackout-in-spain-portugal-started-with-2200-mw-power-production-loss\/"},"modified":"2025-05-13T07:55:23","modified_gmt":"2025-05-13T04:55:23","slug":"blackout-in-spain-portugal-started-with-2200-mw-power-production-loss","status":"publish","type":"post","link":"https:\/\/tietopankki.crnet.fi\/fi\/yleinen\/blackout-in-spain-portugal-started-with-2200-mw-power-production-loss\/","title":{"rendered":"Blackout in Spain, Portugal started with 2,200 MW power production loss"},"content":{"rendered":"<div class=\"mp_wrapper\">\n  <div class=\"mepr-unauthorized-message\">\n    <p>You are unauthorized to view this page.<\/p>\n  <\/div>\n  <div class=\"mepr-login-form-wrap\">\n            \n<div class=\"mp_wrapper mp_login_form\">\n                  <!-- mp-login-form-start -->     <form name=\"mepr_loginform\" id=\"mepr_loginform\" class=\"mepr-form\" action=\"https:\/\/tietopankki.crnet.fi\/fi\/login-2\/\" method=\"post\">\n            <div class=\"mp-form-row mepr_username\">\n        <div class=\"mp-form-label\">\n                              <label for=\"user_login\">Username<\/label>\n        <\/div>\n        <input type=\"text\" name=\"log\" id=\"user_login\" value=\"\" \/>\n      <\/div>\n      <div class=\"mp-form-row mepr_password\">\n        <div class=\"mp-form-label\">\n          <label for=\"user_pass\">Password<\/label>\n          <div class=\"mp-hide-pw\">\n            <input type=\"password\" name=\"pwd\" id=\"user_pass\" value=\"\" \/>\n            <button type=\"button\" class=\"button mp-hide-pw hide-if-no-js\" data-toggle=\"0\" aria-label=\"Show password\">\n              <span class=\"dashicons dashicons-visibility\" aria-hidden=\"true\"><\/span>\n            <\/button>\n          <\/div>\n        <\/div>\n      <\/div>\n            <div>\n        <label><input name=\"rememberme\" type=\"checkbox\" id=\"rememberme\" value=\"forever\" \/> Remember Me<\/label>\n      <\/div>\n      <div class=\"mp-spacer\">&nbsp;<\/div>\n      <div class=\"submit\">\n        <input type=\"submit\" name=\"wp-submit\" id=\"wp-submit\" class=\"button-primary mepr-share-button \" value=\"Log In\" \/>\n        <input type=\"hidden\" name=\"redirect_to\" value=\"\/fi\/wp-json\/wp\/v2\/posts\/139956\" \/>\n        <input type=\"hidden\" name=\"mepr_process_login_form\" value=\"true\" \/>\n        <input type=\"hidden\" name=\"mepr_is_login_page\" value=\"false\" \/>\n      <\/div>\n    <\/form>\n    <div class=\"mp-spacer\">&nbsp;<\/div>\n    <div class=\"mepr-login-actions\">\n        <a\n          href=\"https:\/\/tietopankki.crnet.fi\/fi\/login-2\/?action=forgot_password\"\n          title=\"Click here to reset your password\"\n        >\n          Forgot Password        <\/a>\n    <\/div>\n\n      \n    <!-- mp-login-form-end --> \n  <\/div>\n      <\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<div class=\"smart_content_wrapper\">\n<p>The recent blackout in Spain and Portugal started with the loss of electricity production in power plants with a total capacity of 2,200 MW in the south of Spain, according to an update from the European Network of Transmission System Operators for Electricity (ENTSO-E). ENTSO-E published the sequence of relevant events from the incident on April 28, which caused a total blackout in Spain and Portugal. The system was fully restored after 16 hours. A small area in France, close to the border with Spain, was also affected by the incident, albeit for a very limited duration, the organization said. At the end of 2024, Spain\u2019s installed capacity for electricity production was 129 GW or 129,000 MW.<\/p>\n<p>The blackout was the result of a complex sequence of events, ENTSO-E said. It published a preliminary chronology. During the half hour before the incident, two periods of power and frequency swings were observed in the Continental European Synchronous Area, between 12:03 and 12:07 and between 12:19 and 12:21, respectively. \u201cThe TSOs of Spain (Red Electrica) and France (RTE) took actions to mitigate these oscillations. At the moment of the incident, there were no oscillations and the power system variables were within normal operation range,\u201d the update reads.<\/p>\n<p>According to ENTSO-E, the investigation will be split into two phases. First, the panel would collect and analyze all available data on the incident to reconstruct the events of April 28 and determine the causes of the blackout. The insights would be completed and published in a factual report. In the second phase, for the final report, the panel is tasked with establishing recommendations to help prevent similar incidents.<\/p>\n<p>Source: <a rel=\"noopener\" href=\"https:\/\/balkangreenenergynews.com\/blackout-in-spain-portugal-started-with-2200-mw-power-production-loss\/\">Balkan Green Energy News<\/a><\/p>\n<\/div>\n<p>The post <a rel=\"noopener\" href=\"https:\/\/vastuullisuusuutiset.fi\/fi\/environmental-news-en\/6-701\/\">Blackout in Spain, Portugal started with 2,200 MW power production loss<\/a> appeared first on <a rel=\"noopener\" href=\"https:\/\/vastuullisuusuutiset.fi\/fi\">Vastuullisuusuutiset.fi<\/a>.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[22,1],"tags":[3821,575,3728,1102,655],"class_list":["post-139956","post","type-post","status-publish","format-standard","hentry","category-news","category-yleinen","tag-blackout","tag-environmental-news-en","tag-portugal","tag-spain","tag-yleinen"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/posts\/139956","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/comments?post=139956"}],"version-history":[{"count":0,"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/posts\/139956\/revisions"}],"wp:attachment":[{"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/media?parent=139956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/categories?post=139956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tietopankki.crnet.fi\/fi\/wp-json\/wp\/v2\/tags?post=139956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}